D'Hondt Thermal Solutions

D’Hondt Thermal Solutions

illustration

Shipment of Air-cooler Modules to Shaybah site

DH-TS has shipped the last 4 Air-Cooler Modules to a Gas plant near Shaybah from their Jubail facility in KSA.Those Air Coolers are intended for propane condensing.All DH-TS teams were proud to participate to this major Project.Thanks to the teams in Saudi Arabia and France for their strong involvement all along the design, manufacturing and […]

Shipment of Air-cooler Modules to Shaybah site Lire la suite »

illustration

LNG : DH-TS selected by TP Oil & Gas Mexico (Technip FMC)

D’Hondt Thermal Solutions has been awarded by TP Oil & Gas Mexico (TechnipFMC)  the design and manufacturing of complete modularized Air Cooled Heat Exchangers for Energía Costa Azul (ECA) LNG facility in Baja California, Mexico. ECA LNG is a joint venture between Sempra LNG, IEnova and Total. Engineering and Project Management will be handled in France,

LNG : DH-TS selected by TP Oil & Gas Mexico (Technip FMC) Lire la suite »

illustration

D’Hondt Thermal Solutions and Elbrons team up to service their clients

DH-TS is proud to announce it becomes the exclusive Service partner of ELBRONS solutions in the Middle-East. ELBRONS (www.elbrons.com) is a world leader in servicing solutions for Air-Cooled Heat Exchanger capacity enhancement. Thanks to this partnership, DH-TS will offer their customers with extended service solutions comprising Dry or Robotic water bundle cleaning, High efficiency adiabatic

D’Hondt Thermal Solutions and Elbrons team up to service their clients Lire la suite »

illustration

Completion and delivery of the batch 2 FOB Gunsan for METHANEX G3 PJT.

Last month was a real challenge for all DH-TS team but, finally, yesterday evening, our 2nd and final batch of ACHE was delivered FOB Gunsan Port and shipped. This batch comprises of 18 bays which are part of the 39 bays we manufactured for METHANEX G3 PJT. They are now heading to La Nouvelle-Orléans Port

Completion and delivery of the batch 2 FOB Gunsan for METHANEX G3 PJT. Lire la suite »

illustration

Delivery of Kazakh Project from DH-TS France

D’Hondt Thermal Solutions has delivered to its Client K.P.I (Kazakhstan Petrochemical Industries) five complete Air-Cooled Heat Exchangers fully modularized. Engineering and Project Management have been performed in France, bundles have been manufactured in our Korean factory and modules assembled in Antwerp Port before being shipped to Kazakhstan. The job has been performed without interruption during COVID

Delivery of Kazakh Project from DH-TS France Lire la suite »

illustration

Delivery of US project from DH-TS Korea

D’Hondt Thermal Solutions is delivering 40 complete modularized Air Cooled Heat Exchangers for a new Methanol plant located in Louisiana, USA. The project has been awarded to D’Hondt Thermal Solutions by one of the Leading American E.P.C company. Engineering and Project Management has been handled in France, while bundles and modules have been manufactured and

Delivery of US project from DH-TS Korea Lire la suite »

illustration

Completion and delivery of the batch 1 FOB Gunsan for METHANEX G3 PJT.

End of last week, our 1st batch of ACHE out of 2 was delivered FOB Gunsan Port. This batch comprises of 21 bays which are part of the 39 bays we are manufacturing for METHANEX G3 PJT. They are now heading to La Nouvelle-Orléans Port to be delivered nearby, in Geismar. Let’s focus on the

Completion and delivery of the batch 1 FOB Gunsan for METHANEX G3 PJT. Lire la suite »

illustration

Delivery of Modules, Gas Plant in Saudi Arabia

June 2020, we have delivered the ACHE module to our Client. It will cool their turbine on Abqaiq plant.Congratulations to the Saudi and French teams for their hard job during this sensible period. A DH-TS Great and successful collab once again between DHTS-FR and DHTS-KSA especially during COVID-19 period …Another global success for d’Hondt Thermal

Delivery of Modules, Gas Plant in Saudi Arabia Lire la suite »

Downloads